Who it's for
Built for the people moving the dirt.
Three roles need the same two answers: where the soil is, and what moving it costs. MassBalance puts all three on the same map, and each one reads the same numbers off it.
The three roles at a glance
Developers
The soil cost, known up front.
Put a number on the soil line before the budget is locked
Total cost
$16,912
material + delivery
- Price
- per m³on every site
- Total
- materialplus delivery
Jump to 02, the developers sectionGuessed rates per kilometre · phone calls for prices
Engineers
Up to four routes, priced side by side.
Compare the real road options before committing to one
Delivery cost
$155.00
50 km, two zones
- Routes
- up to 4per pair of sites
- Delivery
- zone by zoneeach kilometre
Jump to 03, the engineers sectionStraight-line distance · one flat rate per kilometre
Builders
Who has the soil, and what it costs.
Find enough soil nearby, at the lowest delivered cost
Supply plan
3,000 m³
from two sources
- Sources
- up to 3in one plan
- Radius
- up to 300 kmyou set it
Jump to 04, the builders sectionRinging round for soil · word of mouth on prices
A — Developers
For developers and asset owners.
You sign the cheque for soil moves and rarely see the number until the invoice. MassBalance prices the material and the road it travels on one screen, before anything is booked.
Today
- Soil costs landing late, after they're sunk
- A soil line in the budget that is really a guess
- No way to compare two sources before committing
With MassBalance
- Material cost, delivery cost and the total, up front
- Compare sources on delivered cost, not on distance
- A price per cubic metre on every site you look at
B — Engineers
For civil and earthworks engineers.
You are the one asked what the haul will cost, and a flat rate per kilometre is not an answer. MassBalance gives you up to four real road routes for a pair of sites, and prices each against the ground it crosses.
Today
- Straight-line distance standing in for a road
- One flat rate per kilometre across every zone
- No way to show why one route beats another
With MassBalance
- Up to four road routes, with distance and drive time
- Each kilometre charged at the rate of the zone it falls in
- The per-zone breakdown behind every delivery cost
C — Builders
For earthworks contractors and estimators.
You need soil on site and the nearest source is short. Finding the rest is phone calls. MassBalance searches the sources around a destination and builds the cheapest way to cover it.
Today
- Phoning round to find who has soil this week
- The cheapest material is rarely the cheapest delivered
- Finding out late that nearby supply cannot cover it
With MassBalance
- Search for sources up to 300 km around a destination
- The cheapest plan, combining up to three of them
- A warning when nearby supply cannot cover the need
"A haul used to be priced on a best guess. Now the road, the rates and the total are on screen before you commit."